
点击放大查看
TPS65131RGET
| Manufacturer | |
| Description | Conv DC-DC Dual Inv/Step Up 2.7V to 5.5V 24-Pin VQFN EP T/R IC REG BOOST INV ADJ 2A DL 24QFN Voltage Regulators - Switching Regulators Adj Dl Otp Switch Boost DC/DC IC, CONV DC/DC POS/NEG 24-QFN IC, DC/DC CONVERTER, VQFN-24 Split-Rail Converter with Dual Positive and Negative Outputs (300mA typ) Texas Instruments , 双 直流-直流转换器, 反相,升压, 1.95A, 2.7 → 5.5 V输入, -15 → -2 V,3.2 → 15 V输出 Switching Voltage Regulators Adj Dl Otp Switch Boost DC/DC |
| Category |
商业参数
| 其他名称 | 296-17349-2 | 产品类别 | Voltage Regulators - Switching Regulators |
| 标准包装数量 | Tape & Reel | 工厂包装数量 | 250 |
| 标准封装名称 | QFN | ||
合规参数
| RoHS | Lead free / RoHS Compliant | SVHC | :No SVHC (20-Jun-2013) |
| 欧盟RoHS | Compliant | 海关税号 | 85423190 |
| 零件状态 | ACTIVE | 抗辐射加固 | No |
电气参数
| 精度 | :3% | 频率 | :1.25MHz |
| 效率 | 85 % | 输出类型 | Adjustable |
| 稳压器类型 | :Boost/Inverting | 额定电压 | -15 to -2|3.2 to 15 V |
| 输出电流 | 1.95(Typ) A | 供电电压 | 2.7 to 5.5 V |
| 输出数量 | 2 | 稳压器拓扑 | Inverting/Step Up |
| 开关稳压器 | Yes | 最大额定电流 | Catalog |
| 开关频率 | 1380(Typ) kHz | 同步整流 | No |
| 最小输入电压 | -15 V ~ 15 V | 直流输入电压(最小) | 2.7 V |
| 电压输出差(典型值)@ 距离 | :-15V | ||
机械参数
| 宽度 | 4.15(Max) | 重量 | 0.001524 oz |
| 包装方式 | Tape and Reel | 引脚样式 | No Lead |
| 端接方式 | :SMD | 安装类型 | Surface Mount |
| 安装样式 | SMD/SMT | 引脚数 | :24 |
| 封装形式 | 24VQFN EP | 冷却的封装 | VQFN EP |
| 材料表面处理 | :MSL 2 - 1 year | 总长度 | 4.15(Max) |
| 包装数量 | VQFN EP | 位数 | 24 |
| 外壳尺寸-插件 | 0.95(Max) | 供应商器件封装 | 24-VQFN (4x4) |
产品信息
| 类型 | Inverting|Step Up | 系列 | TPS65131 |
| 软件 | SLVS493C | 基本单元 | :65131 |
| 图案编号 | Y | 功能框图 | fbd_slvs493c.gif |
| 使用的IC/零件 | View | 印刷电路板数量 | 24 |
环境参数
| 测试温度 | -40 to 85 | 工作温度 | -40 to 85 °C |
Documents & Media
相关型号

TPS63700DRCT
texas instruments
Conv DC-DC Single Inv 2.7V to 5.5V 10-Pin VSON EP T/R IC REG BUCK BOOST INV ADJ 10SON Voltage Regulators - Switching Regulators Adj -15V Out Inv DC/DC Converter IC, INVERTING DC/DC CONVERTER, SON-10 IC, DC/DC INV -15V 10-SON Adjustable, -15V Output Inverting DC/DC Converter in 3x3 QFN Texas Instruments 直流-直流转换器, 反相, 360mA, 2.7 → 5.5 V输入, -15 → -2 V输出, 1.38 MHz, 10针 SON封装 Switching Voltage Regulators Adj -15V Out Inv DC/DC Converter

OPA2132PA
texas instruments
OP Amp Dual GP ±18V 8-Pin PDIP Tube IC OPAMP GP 8MHZ 8DIP OPA2132PA, Dual Operational Amplifier 8MHz, 8-Pin PDIP High Speed Operational Amplifiers High Speed FET-Input Oper Amplifier OP Amp Dual GP �18V 8-Pin PDIP Tube OP AMP, DUAL FET I/P, 2132, PDIP8 Operational amplifier; 8MHz; 2.5÷18VDC; Channels:2; DIP8 High Speed FET-Input Operational Amplifiers Operational Amplifier Dual 8 MHz DIL-8, OPA2132, OPA2132PA, Texas Instruments Texas Instruments 双 运算放大器, 8MHz, 8针 PDIP

TPS65131EVM-063
texas instruments
Evaluation Module For Low Cost, Low Power, Rail To Rail Operational Amplifiers Micro Amplifier Series Power Management IC Development Tools TPS65131-063 Eval Mod EVALUATION MOD FOR TPS65131-63 Lo Cost, Lo Pwr, Rl-Rl Eval Module TPS65131EVM-063 EVALUATION MODULE Development kit: TI; TPS65131

